In 2022, ground improvement project design was carried out for the quay and pier structure of Herçelik Tersanecilik A.Ş. with reference to the borings made in the field. Within the scope of the project, a total of 99 (1,784 meters) intersecting bored piles with a diameter of ϕ80 cm were completed. In addition, 58.4 meters of guide wall beam was completed simultaneously during the intersecting pile works.