In 2023, in order to prevent the settlements observed in the foundations of the Cooling Cutting building of Şişecam A.Ş., ground improvement project design was carried out with reference to the borings made in the field. Within the scope of the project, a total of 4,872 m ϕ30 cm diameter reinforced/unreinforced mini DSM/Pile columns were manufactured inside an existing factory. In addition, 4 mini DSM/Pile loading tests were performed within the scope of quality control tests.
Services given:
Applications: