Temporary shoring was designed by GEOBOS with reference to the Soil and Foundation Investigation Data Report and Geotechnical Report prepared for the relevant site. In the shoring project with a maximum excavation height of 11 m, a total of 1,935 m Ø65-55 cm diameter bored piles, 5,820 m temporary prestressed anchors and 752 m temporary soil nails were undertaken for temporary shoring.
Services given:
Applications: