In 2023, a ground improvement project was designed with reference to the Soil and Foundation Investigation Report prepared for the Superfilm Factory Site of Sanko Tekstil İşletmeleri San. ve Tic. A.Ş., the ground improvement project design was made with reference to the Soil and Foundation Investigation Report. Within the scope of the project, a total of 33,930 m (ϕ25-30 cm) mini piles under the foundation and 1,034 m (ϕ65 cm) bored piles under the silo foundation were constructed. In addition, 6 mini pile loading tests were performed within the scope of quality control tests.