The design and construction of a deep excavation with soil nailing shoring system was carried out in Tuzla, Istanbul. In this project, a total of 6.500 sqm shoring surface, 19.000 m soil nail and 2.000 m prestressed anchorage have been implemented. Maximum excavation height is: H= 18,5m.
Services given:
Applications: