The soil investigation and soil improvement works of Nestlé Elixir Factory to be opened within the Nestle Factory compound production facility have been carried out. Within the scope of soil investigation 9 soil borings (825 m), geophysical works, pressuremeter and laboratory tests have been carried out.
A total of 37.500m jet grout columns have been constructed and 6.500 sqm geotextile has been placed within the scope of soil improvement project. In addition, a manhole was replaced and 5.500 m³ excavation, 4.500 m³ backfilling and compression work were completed.
Services given:
Applications: