In 2021, a total of 6,800 m bored piles with a diameter of ϕ80 cm were installed under the foundation of the Gemont Industrial Facility structure on the land owned by Gemlik Gübre Sanayii A.Ş. in Gemlik. Pile axial, tensile, lateral, dynamic loading and continuity tests were performed for quality control of the fabrications within the scope of the project.
Services given:
Applications: