Beykoz Interior Ground Improvement


PROJECT INFO

Project:
Ground Improvement Project of an Existing Structure in Istanbul Beykoz
Customer:
Yıldırım Holding
Date:
2024
Location:
Istanbul, Beykoz

In 2024, at the existing structure site in Beykoz, a total of 2376 Deep Soil Mixing (DSM) columns with a diameter of 35 cm and 204 free injection columns were constructed to increase soil bearing capacity and limit settlement problems.
Through axial load, pull-out, core sample unconfined compression, and cross-hole tests performed to verify compliance with design criteria during the Application process; the system's compliance with design criteria, technical specifications, and safety standards was technically evaluated.


Services given:

Soil Improvement

Applications:

Mini DSM




<
>