Soil Improvement and Cutoff Wall Works of Bebek Angel Blue Restoration Project
Customer:
Form Yapi Ltd.Sti.
Year:
2009
Place:
Istanbul, Bebek
After removal of existing dock, excavation, installation of 540 m pipe pile, reinforced concrete deck and soil improvement with jet grout column in the dock and land connection site have been done.