In Dudullu, Istanbul, implementation of soil nailing / shotcrete shoring supported with mini piles. Vertical shoring surfaces have then been covered with precast panels. In this project, 1.600 sqm of shoring surface, 1.600 m of mini piles and 500 m of prestressed anchorage have been produced in total. Maximum excavation height is: H= 11 m.
Services given:
Applications: