Temporary shoring and foundation bored piling works were carried out by GEOBOS for the Epoxy Resin Plant area of Akkim Kimya San. ve Tic. A.Ş.'s Epoxy Resin Plant in Yalova Çiftlikköy,. Within this scope, a total of 5,563 m (ϕ65-80 cm) bored piles, 4,466 m (ϕ30 cm) mini piles, 1,165 m temporary prestressed anchors, 168 m soil nails, 1,200 m2 shotcrete and 392 m tie-back were constructed in the facility area. In addition, prestressed anchor acceptance tests and displacement controls with inclinometer were carried out within the scope of the project.
Services given:
Applications: